GeReLEO-SMART at EMC Test
The thermal-vacuum test in Beremen have been conducted completely and now the equipment is tested for electro-magnetic compatibility (EMC). The tests will last at least two weeks and assure that there will be no interferences from and towards other components of the Heinrich-Hertz-Satellite. Ralf Wilke as project manager and test engineer is operating the payload during the test.