Space Flight Hardware ready for integration
Following a successful technical review and test, the next work package is an extensive test campaign. It should demonstrate that the equipment is able to withstand vibration, vacuum and thermal changes that will occur during launch and orbit phase of the satellite. Extensive electromagnetic compatibility tests are also part of the test program. If all tests are evaluated as passed, the payload will be delivered in the first half of 2020 for the final integration on the satellite.